I'm running patches and having a lot of 'bobbin break' errors, and when I check the bobbin the pigtail end is less than 1/2 inch. Always happens after it has stopped for a cut and moved.
Is there a setting where I can lengthen the 'thread' end on the XT? It's quadrupling the length of time to get them done.
Is there a setting where I can lengthen the 'thread' end on the XT? It's quadrupling the length of time to get them done.
Comment